CLIENT

DCO Energy

PROJECT DESCRIPTION

INNOVA Global’s EIT was selected by DCO Energy in Hamilton, New Jersey to provide (2) two hot catalyst systems with stack \ silencers for Solar Taurus 60 gas turbines installed at the Apex Landfill in Apex, Nevada.

SCOPE OF WORK

Innova designed and fabricated in our facilities in Monterrey, Mexico. The hot catalyst systems consisted of:

  • CFD Flow Modelling
  • Tempering Air System with Inlet Filtration
  • Aqueous Ammonia Vaporization System
  • NOx Reduction System
  • Stack with Silencing

GAS TURBINE PERFORMANCE

  • Operating Conditions –100% load
  • NOx Emissions – 25 ppm

STACK EMISSION REQUIREMENTS

  • NOx Emissions – 1.7 ppm
  • NH3 Slip – 10 ppm

ACOUSTIC REQUIREMENTS

  • 85 dBA at 3 ft. from each stack, 5 ft. above grade