CLIENT

Solar Turbines

PROJECT DESCRIPTION

INNOVA Global was selected by Solar Turbines in San Diego, California to provide (1) one hot catalyst system with stack \ silencers for the National Grid – Bunker Road Station Titan 130 gas turbine located on Nantucket Island in Massachusetts.

SCOPE OF WORK

Innova designed and fabricated in our facilities in Monterrey, Mexico. The hot catalyst systems consisted of:

  • CFD Flow Modelling
  • Tempering Air System with Inlet Filtration
  • CO Reduction System
  • Aqueous Ammonia Vaporization System
  • NOx Reduction System
  • Stack with Silencing

GAS TURBINE PERFORMANCE

  • Operating Conditions –100% load
  • NOx Emissions – 70 ppm
  • CO Emissions – 25 ppm

STACK EMISSION REQUIREMENTS

  • NOx Emissions – 5.0 ppm
  • CO Emissions – 5 ppm
  • NH3 Slip – 5 ppm

ACOUSTIC REQUIREMENTS

  • 45.5 dBA at 1,230 ft. from each exhaust stack
  • 85 dBA at 3 ft. from each stack, 5 ft. above grade