CLIENT

GE Houston

PROJECT DESCRIPTION

INNOVA Global was selected by General Electric in Houston, Texas to provide (6) six hot catalyst systems with stack \ silencers for various LM6000 series gas turbines over several contracts.

SCOPE OF WORK

INNOVA designed and fabricated in our facilities in Monterrey, Mexico. The hot catalyst systems consisted of:

  • Physical flow modelling
  • Tempering Air System with Inlet Filtration
  • CO Reduction
  • Anhydrous Vaporization System
  • NOx Reduction System
  • Stack with Silencing

GAS TURBINE PERFORMANCE

  • Operating Conditions –100% load
  • NOx Emissions – 25ppm
  • CO Emissions – 125 ppm

STACK EMISSION REQUIREMENTS

  • NOx Emissions – 2.5 ppm
  • CO Emissions – 4 ppm
  • NH3 Slip – 5 ppm

ACOUSTIC REQUIREMENTS

  • 59 dBA at 400 ft. from each exhaust stack
  • 85 dBA at 3 ft. from each stack, 5 ft. above grade