CLIENT

El Paso Electric

PROJECT DESCRIPTION

INNOVA Global was selected by El Paso Electric to design & fabricate a CO reduction system with stack \ silencer for a Mars 100 gas turbine on a compressor station.

SCOPE OF WORK

INNOVA Global designed and fabricated the entire system in our facilities in Monterrey, Mexico. Innova’s hot catalyst system scope consisting of:

  • Physical flow modelling
  • CO reduction system
  • 2-stage Turbine Exhaust Silencing
  • Stack \ silencer system
  • Commissioning

GAS TURBINE PERFORMANCE

  • Operating Conditions –100% load
  • CO Emissions – 20 ppm

STACK EMISSION REQUIREMENTS

  • CO Emissions – 1 ppm