CLIENT

BOC Process Plants

SCOPE OF WORK

Design, supply and installation of the structural steel and acoustic envelope including acoustic maintenance doors, Personnel doors, and ventilation system for a VSA (Vacuum Swing Absorption) ISO4C Oxygen Plant at the Owens Corning glass fiber factory in Wrexham, U.K. Special consideration was given to ventilation flow to achieve proper process requirements. 

ACOUSTICAL REQUIREMENTS

The acoustic envelope and silencing components were designed to achieve two noise level targets:

  • 50 dBA at 100 m from VSA northeast wall
  • 41 dBA at 70 m from VSA south wall