Projects

CLIENT

Duke Energy/Union Gas Ltd.

PROJECT DESCRIPTION

Both intake and exhaust systems were being affected by corrosion. The replacement systems needed to meet current, tighter noise regulations while fitting existing equipment.

SCOPE OF WORK

Initial project was for design, supply and installation assistance of two exhaust systems: expansion joint, ducting, elbow, exhaust silencer, support steel, and on-site assistance with system installation.Second project for design,

The second project was for design, manufacture, and supply of two intake systems: filter house, expansion joint, and intake silencer with support steel. 

ACOUSTICAL REQUIREMENTS

  • 30 dBA at 500m from stack
  • 25 dBA at 500m from filter house

NOISE SOURCES

  • Two (2) Rolls Royce Avon Combustion Turbines

RESULTS

These two projects took place approximately 1 year apart. Satisfied, repeat customers are a common occurrence, and indicate the quality of work and service provided on every project.