CLIENT
Transcontinental Gas Pipe Line Corporation
SCOPE OF WORK
INNOVA had to remove and dispose of existing asbestos-transite exterior cladding.
Design, supply and install the acoustic enclosure and acoustic ventilation system for the existing gas metering building.
ACOUSTICAL REQUIREMENTS
- 45 dBA at 100 ft.
RESULTS
INNOVA achieved acoustical compliance.