CLIENT

Transcontinental Gas Pipe Line Corporation

 

 

 

SCOPE OF WORK

INNOVA had to remove and dispose of existing asbestos-transite exterior cladding.

Design, supply and install the acoustic enclosure and acoustic ventilation system for the existing gas metering building. 

ACOUSTICAL REQUIREMENTS

  • 45 dBA at 100 ft.

RESULTS

INNOVA achieved acoustical compliance.