CLIENT

Alghanim International General Trading & Contracting

PROJECT DESCRIPTION

Shuwaikh Power was a fast-track delivery project with a 6-month completion timeframe from ground breaking to commissioning. The order for six 45’ bypass stacks was received in mid-January 2007, and the equipment was shipped at the end of March. This eleven-week turnaround was possible due to our extensive experience with GE LM6000 systems, and our strong relationship with manufacturing partners.

SCOPE OF WORK

INNOVA designed, manufactured and supplied six complete exhaust systems with Higgott-KaneTM silencing; expansion joint, base module and custom-designed silencing for 45’ exhaust stack.

In September 2007, the second order from Alghanim International Trading & Contracting was received for four GE LM6000 Exhaust systems and twelve GE LM6000 Exhaust system stack extensions for use at two separate sites in Kuwait. Acoustic requirements and design considerations identical to Shuwaikh. 

ACOUSTICAL REQUIREMENTS

  • 59 dBA at 400 ft. from each stack
  • 85 dBA at 3 ft. from the stack, 5 ft. above grade

SILENCING SOLUTIONS

Exhaust systems with Higgott-KaneTM Silencing for six GE LM6000 Combustion Turbines.