CLIENT

BBA, A Joint Venture

SCOPE OF WORK

Design and supply of acoustic envelope for four buildings; a power generation building, motor control center, de-ethanizer compressor building, and sales gas compressor building. An acoustic building ventilation system, fans, silencers, and acoustically treated equipment and personnel doors were also designed and supplied. Extra measures were taken to protect against corrosion using stainless steel and using the barrier series coating on the cladding to counteract the humidity and the saline environment.

ACOUSTICAL REQUIREMENTS

55 dBA at fence line of plant.

NOISE SOURCES

  • Two 4700 Hp Solar Centaur 40 S Turbines
  • Two 14100 Hp Solar Mars 100 S Turbines complete with Dresser-Rand Datum 10R5 S
  • Two 2000 Hp, 1000 rpm Cooper Superior 2412G complete with Cooper Superior MH64

SILENCING SOLUTIONS

INNOVA utilized its Type E Wall for all the buildings.

RESULTS

Buildings designed to achieve:
An effective STC of 47 and NRC of 0.92