CLIENT

Propak Systems Ltd.

PROJECT DESCRIPTION

Innova was selected by Propak Systems Ltd. to design, supply and erect nine (9) acoustic on-skid enclosures at the Golden Spike Gas Plant near Edmonton, Alberta. 

SCOPE OF WORK

For all nine enclosures, INNOVA designed and installed the acoustic envelope and doors. Panels were included in the design to facilitate the removal and installation of equipment. Three enclosures for the gas compressors were also supplied with an acoustic ventilation system, including fans, dampers, and silencers.

ACOUSTICAL REQUIREMENTS

Alberta Energy and Utilities Board (AEUB) Noise Regulation:

Plant expansion could not contribute additional noise to surrounding area. The noise level target for the plant was 41 dBA at 500 m

NOISE SOURCES

Caterpillar G3608TA engines:

  • 3335 Hp and 1000 rpm
  • Sound Power Level (PWL) for each engine of 143dBA